AT&T

  • Superior Drive System Improvement Project: AT&T has contracted with West Valley Construction to upgrade and improve their system. Work will be performed along Campbell Ave between Kim Louis Dr to Superior Dr and along Superior Dr from Campbell Ave north 400'. Work begins April 18th and will last approximately 4 weeks.
  • Fawn Dr / Fawn Ct / Beth Way / Archer Way / Abbott Ave / Harriet Ave System Improvement Project: AT&T has contracted with Irish Construction to upgrade and improve their system along the listed streets. Work begins April 17th and will last approximately 8 weeks. 

Caltrans State Route 17 Resiliency and Adaptation Plan

Caltrans is preparing a State Route 17 Resiliency and Adaptation Plan.  This plan seeks to:

  • Advance goals of the California Transportation Plan 2050 and Climate Action Plan for Transportation Infrastructure
  • Collaborate with the public to establish a collective vision
  • Prioritize project opportunities that align with assessing physical climate risk and safety improvements that reduce fatalities and severe injuries.

For more information, see https://dot.ca.gov/caltrans-near-me/district-5/district-5-current-projects/sr-17-ra-plan

Comcast: 

No major projects at this time.

PG&E 

  • Hamilton Ave Main Line Gas Replacement Project: PG&E has contracted with ARB Inc. to replace the existing gas line on Hamilton Ave between Winchester Blvd and Salmar Ave. Night work will begin Monday, April 29th, from 9pm to 6am, and will continue through the month of May. 

San Jose Water Co:

No major projects at this time.

Santa Clara County

  • The County of Santa Clara is developing a comprehensive Local Roadway Safety Plan (LRSP). An LRSP provides a framework for identifying, analyzing, and prioritizing roadway safety improvements on local county-maintained roads. This plan will enable the County to enhance traffic safety for all modes of transportation and for all ages and abilities.
    County of Santa Clara Local Roadway Safety Plan

VTA 

  • Rail Rehab Project: VTA will be adding swing gates, pedestrian gates, and handrails at numerous crossings along its light rail line. Work will also include signal upgrades and civil improvements at sidewalk and curb ramps at various intersections.

West Valley Sanitation District: 

  • Campbell Ave Sewer Repair Project: West Valley Sanitation District has contracted with Abel Construction to repair multiple locations of sewer main line pipe along Campbell Ave between Railway Ave and Los Gatos Creek Bridge. Work begins April 1st and will last approximately 6 weeks.
  • Campbell Ave Sewer Repair Project: West Valley Sanitation District has contracted with Abel Construction to repair the main sewer line pipe along Dillon Ave from Campbell Ave to approximately 250' south. Work begins April 17th and will last approximately 4 weeks.